In order to expedite the construction of Hydro One’s Relay Buildings A and B, while providing an economical alternative to a precast building, the Engineer recommended and organized a change of construction methodology to tilt-up concrete construction.
The alternate method of construction through Tilt Wall cut weeks off of the construction schedule, provided a highly durable structure and reduced the jobsite’s complexities, resulting in another very happy client.
General
Location & Year
Clarington, OntarioCategory
Commercial & IndustrialGeneral Contractor
JJ McGuire General ContractorsArchitect
Barry Bryan AssociatesStructural Engineer
Barry Bryan AssociatesDevelopment/Owner
Hydro OneTechnical
Total # of Panels
66Weight of Heaviest Panel
46,153 lbsHeight of Tallest Panel
19'-7"Size of Largest Panel
351 sq ftProject Finish
StainInsulated Panels
12,510 sq ftNon-Insulated Panels
7,828 sq ftHave a Project You’d Like to Discuss?
We’d love to hear about it! Send us a few details
and a member of a team will be in touch.
About Tilt Wall
Tilt Wall is a subcontractor committed to bringing a superior building product to the Ontario construction industry since 2001. With its tilt-up construction and design experience it is able to assist their clients design buildings with lasting beauty and value. It takes pride in building lasting relationships, and impacting the lives of those around them in positive ways.